Archives: Issues

Bowden Farm, Buckland Brewer Wind Turbine – Permitted

1/0017/2013/FUL | Erection of 500kw wind turbine (67m to blade tip), associated infrastructure and access track. | Land At Bowden Farm Buckland Brewer Bideford Devon…

Tredown Farm, Kelly, solar farm (10.5 acres) – Permitted

Original application 02517/2012 Appeal decision number APP/Q1153/A/12/2186865 Approved at appeal    

Babbington Farm, Chilsworthy Wind Turbine – Permitted

1/0350/2013/FUL | Erection of a single wind turbine with maximum blade tip height of 77m, formation or vehicular access track and associated infrastructure. |Babbington Chilsworthy…

Ham Farm, Alverdiscott Wind Turbine – Permitted

1/0126/2012/FUL |Installation of 1 x 35m high wind turbine, access and associated works. |Land At Ham Farm Alverdiscott Devon Permitted  

Coombe Farm, Beaford Wind Turbine – Permitted. Operational

1/0033/2012/FUL |11kw Gaia Wind Turbine 24.8m high-Coombe Farm Beaford Winkleigh Devon EX19 8LJ Permitted

Wonton, South Brent Wind Turbine – Screening opinion

Basic Application Details for 45/2700/14/SCROP Application Description: Reuqest for Screening opinion for proposed 1no. 500kW wind turbine (50m hub height) – 77m to blade tip…

Yelland Farm, High Bickington, Umberleigh Wind Turbine – Permitted

  1/0367/2012/FUL | Erection of a 11kW wind turbine (max 24.8m to blade tip) | Yelland Farm High Bickington Umberleigh Devon EX37 9BX Permitted

Gearns Farm, Holsworthy Beacon Wind Turbine – Permitted

  1/1151/2011/FUL |Erection of a wind turbine (79m to blade tip) – Affecting a public right of way |Gearns Farm Holsworthy Beacon Holsworthy Devon EX22…

Dunstaple Farm, Holsworthy Wind Turbine – Permitted

1/0494/2012/FUL | Installation of a wind turbine (34.2m to blade tip) | Land At Dunstaple Farm Holsworthy Devon EX22 7BP Permitted

Bason Farm, Bradford Wind Turbine – Permitted. Operational

1/0511/2012/FUL | Installation of wind turbine (34.5m height to blade tip) and formation of associated access tracks and cable trench | Land At Bason Farm…

Crimpa Farm, Pancrasweek Wind Turbine – Permitted

1/0265/2011/FUL | Erection of wind turbine – 34.2 metres to blade tip | Land At Crimpa Farm Pancrasweek Devon EX22 7JN Permitted  

Craneham Farm, Buckland Brewer Wind Turbine – Permitted

1/0504/2012/FUL  Erection of 100kW wind turbine (max 39.9m to blade tip) Craneham Farm  Buckland Brewer Bideford EX39 5ND Permitted  

Thorne Farm, Pancrasweek Wind Turbine – Permitted. Operational

  1/0595/2012/FUL  Erection of single 500kw turbine (60.7m to blade tip) and associated infrastructure Land At Thorne Farm, Pancrasweek, Holsworthy Devon EX22 Permitted

Durpley Farm, Shebbear Wind Turbine – Permitted. Operational

1 x 77m wind turbine, Durpley Farm, Shebbear, Stibb Cross EX38 8LP       1/0073/2012/FUL Permitted

Alscott Farm, Shebbear Wind Turbine – Permitted. Operational

1 x 77m wind turbine Land At Alscott Farm Shebbear Beaworthy Devon EX21 5RU       Permitted

Hayrish Farm, South Tawton Wind Turbine – Permitted

1 x 35m wind turbine, Hayrish Farm, South Tawton, West Devon. Permitted

Great Cocktree, North Tawton Wind Turbine – Permitted. Operational

1 x 35m wind turbine, Great Cocktree, North Tawton. Permitted.

Hatherton, Sampford Courtenay Wind Turbine – Permitted

1 x 35m wind turbine, Hatherton, Sampford Courtenay, West Devon. Permitted

Keytherne Farm, Highampton/Hatherleigh Wind Turbine – Permitted. Operational

1 x 46m wind turbine, Keytherne Far, Highampton/Hatherleigh – permitted.

Heywood Farm, Bondleigh Wind Turbine – Permitted. Operational

1 x 79m wind turbine, Heywood Farm, Bondleigh.  Permitted at appeal

Den Brook Wind Farm, North Tawton – Permitted

9 x  120m high wind turbines, North Tawton/Bow, West Devon  Permitted.

New Venn Farm, Lamerton, Solar Farm (33 acres) – Screening

Application number 00140/2013 applicants have been advised that an Environmental Statement is not required New Venn Farm, Lamerton, Tavistock PL19 8RR  Proposed solar farm 33…