Archives: Issues
Bowden Farm, Buckland Brewer Wind Turbine – Permitted
1/0017/2013/FUL | Erection of 500kw wind turbine (67m to blade tip), associated infrastructure and access track. | Land At Bowden Farm Buckland Brewer Bideford Devon…
Tredown Farm, Kelly, solar farm (10.5 acres) – Permitted
Original application 02517/2012 Appeal decision number APP/Q1153/A/12/2186865 Approved at appeal
Babbington Farm, Chilsworthy Wind Turbine – Permitted
1/0350/2013/FUL | Erection of a single wind turbine with maximum blade tip height of 77m, formation or vehicular access track and associated infrastructure. |Babbington Chilsworthy…
Ham Farm, Alverdiscott Wind Turbine – Permitted
1/0126/2012/FUL |Installation of 1 x 35m high wind turbine, access and associated works. |Land At Ham Farm Alverdiscott Devon Permitted
Coombe Farm, Beaford Wind Turbine – Permitted. Operational
1/0033/2012/FUL |11kw Gaia Wind Turbine 24.8m high-Coombe Farm Beaford Winkleigh Devon EX19 8LJ Permitted
Wonton, South Brent Wind Turbine – Screening opinion
Basic Application Details for 45/2700/14/SCROP Application Description: Reuqest for Screening opinion for proposed 1no. 500kW wind turbine (50m hub height) – 77m to blade tip…
Yelland Farm, High Bickington, Umberleigh Wind Turbine – Permitted
1/0367/2012/FUL | Erection of a 11kW wind turbine (max 24.8m to blade tip) | Yelland Farm High Bickington Umberleigh Devon EX37 9BX Permitted
Gearns Farm, Holsworthy Beacon Wind Turbine – Permitted
1/1151/2011/FUL |Erection of a wind turbine (79m to blade tip) – Affecting a public right of way |Gearns Farm Holsworthy Beacon Holsworthy Devon EX22…
Dunstaple Farm, Holsworthy Wind Turbine – Permitted
1/0494/2012/FUL | Installation of a wind turbine (34.2m to blade tip) | Land At Dunstaple Farm Holsworthy Devon EX22 7BP Permitted
Bason Farm, Bradford Wind Turbine – Permitted. Operational
1/0511/2012/FUL | Installation of wind turbine (34.5m height to blade tip) and formation of associated access tracks and cable trench | Land At Bason Farm…
Crimpa Farm, Pancrasweek Wind Turbine – Permitted
1/0265/2011/FUL | Erection of wind turbine – 34.2 metres to blade tip | Land At Crimpa Farm Pancrasweek Devon EX22 7JN Permitted
Craneham Farm, Buckland Brewer Wind Turbine – Permitted
1/0504/2012/FUL Erection of 100kW wind turbine (max 39.9m to blade tip) Craneham Farm Buckland Brewer Bideford EX39 5ND Permitted
Thorne Farm, Pancrasweek Wind Turbine – Permitted. Operational
1/0595/2012/FUL Erection of single 500kw turbine (60.7m to blade tip) and associated infrastructure Land At Thorne Farm, Pancrasweek, Holsworthy Devon EX22 Permitted
Durpley Farm, Shebbear Wind Turbine – Permitted. Operational
1 x 77m wind turbine, Durpley Farm, Shebbear, Stibb Cross EX38 8LP 1/0073/2012/FUL Permitted
Alscott Farm, Shebbear Wind Turbine – Permitted. Operational
1 x 77m wind turbine Land At Alscott Farm Shebbear Beaworthy Devon EX21 5RU Permitted
Hayrish Farm, South Tawton Wind Turbine – Permitted
1 x 35m wind turbine, Hayrish Farm, South Tawton, West Devon. Permitted
Great Cocktree, North Tawton Wind Turbine – Permitted. Operational
1 x 35m wind turbine, Great Cocktree, North Tawton. Permitted.
Hatherton, Sampford Courtenay Wind Turbine – Permitted
1 x 35m wind turbine, Hatherton, Sampford Courtenay, West Devon. Permitted
Keytherne Farm, Highampton/Hatherleigh Wind Turbine – Permitted. Operational
1 x 46m wind turbine, Keytherne Far, Highampton/Hatherleigh – permitted.
Heywood Farm, Bondleigh Wind Turbine – Permitted. Operational
1 x 79m wind turbine, Heywood Farm, Bondleigh. Permitted at appeal
Den Brook Wind Farm, North Tawton – Permitted
9 x 120m high wind turbines, North Tawton/Bow, West Devon Permitted.
New Venn Farm, Lamerton, Solar Farm (33 acres) – Screening
Application number 00140/2013 applicants have been advised that an Environmental Statement is not required New Venn Farm, Lamerton, Tavistock PL19 8RR Proposed solar farm 33…