Alscott Farm, Shebbear Wind Turbine – Permitted. Operational
1 x 77m wind turbine Land At Alscott Farm Shebbear Beaworthy Devon EX21 5RU Permitted
Hayrish Farm, South Tawton Wind Turbine – Permitted
1 x 35m wind turbine, Hayrish Farm, South Tawton, West Devon. Permitted
Great Cocktree, North Tawton Wind Turbine – Permitted. Operational
1 x 35m wind turbine, Great Cocktree, North Tawton. Permitted.
Hatherton, Sampford Courtenay Wind Turbine – Permitted
1 x 35m wind turbine, Hatherton, Sampford Courtenay, West Devon. Permitted
Keytherne Farm, Highampton/Hatherleigh Wind Turbine – Permitted. Operational
1 x 46m wind turbine, Keytherne Far, Highampton/Hatherleigh – permitted.
Heywood Farm, Bondleigh Wind Turbine – Permitted. Operational
1 x 79m wind turbine, Heywood Farm, Bondleigh. Permitted at appeal
Den Brook Wind Farm, North Tawton – Permitted
9 x 120m high wind turbines, North Tawton/Bow, West Devon Permitted.
Oxen Park Farm, Ilfracombe Wind Turbine – Permitted
Oxen Park Farm, Ilfracombe. Application number 55757 for one 40m turbine. Permitted
Batsworthy Cross Wind Farm, Knowstone – Permitted
Application number 56541 The installation and operation of nine wind turbine generators of maximum 103m to tip height, unit transformer enclosures, substation building, anemometer, access…
Fullabrook Down Wind Farm – Permitted. Operational
S36 application for 22 3MW wind turbines. North Devon Council objected so the case went to a public inquiry. Planning permission subsequently granted in 2007….
Newton Downs Farm, Newton Ferrers Solar Farm (28 acres) – Permitted
Application number: 37/1426/15/F Click for further details Description: Temporary (30 years) change of use to agriculture and solar photovoltaic farm with associated static arrays of…
Luscott Barton, Ashford, Barnstaple Solar Farm (72 acres) – Permitted
58007 INSTALLATION OF A 13MWP SOLAR FARM, ASSOCIATED INFRASTRUCTURE, INCLUDING ACCESS TRACKS, DNO AND CLIENT SUBSTATIONS, INVERTER/TRANSFORMER UNITS, UNDERGROUND CABLING AND SECURITY FENCING AT LUSCOTT…
Woodford Farm, Witheridge (solar array) – Permitted
14/01186/FULL Woodford Farm, Witheridge Solar Array Installation of a ground-mounted photovoltaic solar panel array to generate 100kW of power (site area 700 sq m) Land…
Winham Farm, Westcott, Nr Cullompton Solar Farm (27 acres) – Permitted
Installation of solar park to generate up to 5MW of power (site area of 11.10 ha), to include solar panels, transformer housing, security fencing, cameras,…
Stowford Cross, Bradworthy Wind Farm – Permitted. Operational
Application Permitted. 1/1741/2001 | DEVELOPMENT OF A WIND FARM CLUSTER, 3 x 75m high 1 MEGAWATT WIND TURBINE GENERATORS, SUBSTATION, CONSTRUCTION OF ACCESS TRACKS AND…
Higher Darracott, Torrington Wind Farm – Permitted. Operational
Application Permitted. 1/1345/2002 | INSTALLATION OF 3 WIND TURBINES WITH MAXIMUM HUB HEIGHT OF 50M AND MAXIMUM ROTOR DIAMETER OF 62M, ANCILLIARY EQUIPMENT & THE…
Galsworthy, Stibb Cross Wind Farm – Permitted. Operational
Permitted. 1/0375/2008/FUL | Wind energy development comprising the erection of 4 wind turbines each with a maximum overall height of up to 100m, together with…
Halsdon Barton, Cookbury Wind Turbine – Permitted
At appeal. Pending decision. 1/0264/2013/FUL | Installation of one wind turbine 79m to blade tip along with access track, creation of new field entrance, electrical…
Nethercott Wind Farm, Tetcott, Clawton – Permitted
Current application. Permitted by TDC plans committee. 3rd july 2014 1/0036/2014/FULM | Erections of 3 no. wind turbines (77 metres to blade tip) and associated…
Parkfield Farm, Ashburton Solar Farm (37 acres) – Permitted
Basic Application Details for 50/1623/14/F Application Description: Installation of ground mounted solar array (site area 13.56Ha) , approximate output 7MW, and associated works Application Address:…
Balls Wood, Brixton, Plymouth Solar Farm (49.87 acres) – Permitted
07/1814/14/F Installation of ground-mounted solar array (total site area 201800m² 49.87 Acres), estimated output 8.7mw and associated infrastructure SX561 531 adjacent to Balls Wood, Brixton
Marley Thatch Farm, South Brent Solar Farm (46.5 acres) – Permitted
39_45/0706/12/F Application Description: Full planning application for solar PV development consisting of the installation of ground based racking systems comprising 1074 tables, mounted solar panels…